PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Layout from the Administration Building to the New Building pic -3 (800x600).jpg Lessner Electric marking the layout for  underground piping at Rahway Ave. (800x600).jpg Underground sanitary piping Facing South (800x600).jpg Underground sanitary piping Facing West (800x600).jpg Excavating for the underground sanitary piping along column line E Facing South-West (800x600).jpg Installing platforms around Elev. 4-Stair -2 (3rd to 4th Floor) Facing South (800x600).jpg Layout from the Administration Building to the New Building pic -4 (800x600).jpg Layout from the Administration Building to the New Building pic -5 (800x600).jpg Pouring concrete at Elev. 5,6 (3rd Floor) Facing South-West (800x600).jpg
Previous pageNext page Excavating for the underground sanitary piping along column line E Facing South-West (800x600)
Excavating for the underground sanitary piping along column line E Facing South-West (800x600)